STUDI KELAYAKAN PERANCANGAN PPEMBANGKIT LISTRIK TENAGA ANGIN DI PT. ALTRAK 1978 BALIKPAPAN

Authors

  • eka surya uniba
  • Anwar f

Keywords:

wind, Wind, feasibility Analysis PLT economy PLT Wind

Abstract

 

Fossil fuels are depleting renewable energy needs. For that alternative energy is required i.e. wind energy. Wind energy can be designed into a wind power plant (PLT). PLT Wind planned office building of PT. Altrak 1978 is to supply 10% of the total load of the burden of office building of PT. Altrak 1978. This research begins with collecting and processing data on wind speed derived from Agency for meteorology, climatology and Geophysics (BMKG), NASA satellite and data processing of the anemometer so that it brings the potential of wind in the building Office PT Altrak 1978. With the potential of wind in the office building of PT. Altrak 1978 then selected a suitable wind turbines applied in the office building of PT. Altrak 1978 i.e. vertical wind turbines. To supply 10% load then determined a number of wind turbine FIRED POWER STATION components 854, batteries a number of 196, 854, 1 rectifier inverters with a capacity of 28kW. Based on the feasibility

Based on the results of the economic analysis of the feasibility of the Discounted payback period (DPP) in the year to 21 obtained is negative (-), namely in the amount of Rp. 8,277,522,168.86 is not equal to the costs of his investment. Net Present Value (NPV) obtained-Rp. 17,367,942,738.86 (< 0) and the Profitability Index (PI) obtained-1.91.

 

Downloads

Download data is not yet available.

References

[1]. Zooba,F Ahmed, Bansal, Ramesh.“Handbook of Renewable energi technology”, word scientific.2011.
[2]. Daryanto.Y, “Kajian Potensi Angin untuk Pembangkit listrik Bayu”.Balai PPTAG—PT LAG.Yogyakarta.2007
[3]. Rizkyan.Ganda Akbar, “Studi kelayakan pembangkit Listrik Tenaga Angin Laut untuk memenuhi penerangan jembatan Suramadu”.Jurnal Tugas akhir ITS.2009.
[4]. Sahib,koussa, “Analysis for grid connected wind power system in the arid region”,IEEEjournal.2015
[5]. Rashid, M.H., “Power Electronic Handbook", Mc Graw, Hill New York, U.S.2001.
[6]. Ghenau.chauki, “In tech wind energi”, Florida Atlantic University, U.SA.2008.
[7]. Badan Meteorologi Klimatologi dan Geofisika(BMKG) Balikpapan, “Data kecepatan angin di Balikpapan tahun 2015 dan 2016”.Balikpapan.2016
[8]. NASA, “Data Angin tahun 2015”.<URL: https://eosweb.larc.nasa.gov/cgibin/sse/retscreen.cgi?email=rets%40nrcan.gc.ca&step=1&lat=1.1504266&lon=116.8258792&submit=Submit>.2016
[9]. PLN,“Tarif Dasar Listrik”.<URL: http://www.PLN.co.id>.2002
[10]. Kolhe, M., Kolhe, S., Joshi, J.C, “Economic Viability of Stand-Alone Solar Photovoltaic System in Comparison with Diesel-Powered System for India”. Energi Economics.India.2002
[11]. Santiari. I Dewa Ayu, “Studi Pemanfaatan Pembangkit Listrik Tenaga Surya sebagai catu daya tambahan pada Industri Perhotelan di Nusa Lembongan Bali”.Tugas Akhir Universitas Udayana.Bali.2011
[12]. Wenqiang, L., Shuhua, G., Daxiong, Q, “Techno-Economics Assesment For Off-Grid Hybrid Generation Systems and Application Prospect in China”. London : World Energi Council.2004
[13]. Tingkat Suku Bunga kredit Bank.URL:Http://www.bi.go.id .2016
[14]. PLN.Persyaratan umum Instalasi Listrik(PUIL) “instalasi kabel listrik”.2000
[15]. Blueprint Pengolahan Energi Nasional. 2006-2025.